The Edmond Sun

Archive

jc_fence.JPG

Fence installed in preparation for center construction A fence was installed at a downtown Edmond parking lot to separate the future construction of the Public Safety Center. The Public Safety Center will be constructed at 100 E. 1st St. Road closures are scheduled to begin during the first half of September. Thru traffic will not be allowed on First Street between Broadway and Boulevard. Thru traffic will not be allowed on Littler Avenue between Second Street and Main Street. Parking will be stressed during peak times throughout the downtown area as several areas near the construction site will be closed.